Mining Hosting:
Find a right place to host
Want to mine without operating your own facility? With LeedMiner, you can acquire high-performance ASIC miners while our professional consultants connect you with reliable hosting providers - all in one stop. Backed by years of industry experience and a strong global network, LeedMiner delivers reliable resources and tailored solutions to help clients build a long-term mining plan.
- Locations
- 4 regions
- Starting power
- $0.055/kWh
- Provider handoff
- Contract first
4Hosting LocationsEnergy sites
Hosting Locations




LeedMiner introduces independent hosting providers. Review all service terms and sign a contract with your selected provider before deployment. Hosting service and support are provided by the selected provider.
ASIC hosting cost model
Compare Bitcoin miner hosting electricity cost by ASIC
This table uses current public catalog hashrate and nameplate power to estimate 30 days of continuous operation, then applies the lowest and highest listed hosting electricity rates on this page.
Listed hosting electricity range: $0.055–$0.075/kWh| ASIC miner | Cooling | Hashrate | Power | Efficiency | 30-day energy | 30-day electricity range |
|---|---|---|---|---|---|---|
| Antminer S23 XP Hyd (600Th) | Hydro | 600 TH/s | 5,340 W | 8.9 J/TH | 3,845 kWh | $211.46–$288.36 |
| Antminer S23 Hyd (563Th) | Hydro | 563 TH/s | 5,510 W | 9.79 J/TH | 3,967 kWh | $218.20–$297.54 |
| Antminer S23e U2H Hyd | Hydro | 865 TH/s | 8,650 W | 10 J/TH | 6,228 kWh | $342.54–$467.10 |
| Bitdeer Sealminer A3 Pro Hydro | Hydro | 660 TH/s | 8,250 W | 12.5 J/TH | 5,940 kWh | $326.70–$445.50 |
| Whatsminer M73S+ | Hydro | 570 TH/s | 7,125 W | 12.5 J/TH | 5,130 kWh | $282.15–$384.75 |
| Whatsminer M76S+ | Air | 416 TH/s | 5,200 W | 12.5 J/TH | 3,744 kWh | $205.92–$280.80 |
| Bitdeer Sealminer A3 Pro Air | Air | 290 TH/s | 3,625 W | 12.5 J/TH | 2,610 kWh | $143.55–$195.75 |
| Whatsminer M70S+ | Air | 262 TH/s | 3,275 W | 12.5 J/TH | 2,358 kWh | $129.69–$176.85 |
Formula: nameplate power × 24 hours × 30 days. The estimate covers electricity only and excludes setup fees, management, repairs, downtime, curtailment, pool fees, and coin-price changes. Confirm final terms in the provider contract and against metered usage.
Mining hosting FAQ
ASIC miner hosting places mining hardware in a third-party facility that supplies power, networking, cooling, monitoring, and on-site operations. Miner purchase, hosting contract, and mining payouts should be reviewed separately.
Process
How to Start?
Operations fit
Why choose Hosting?
Do you have these troubles?
Don't have the time to maintain your mining farm?
Want to mine but don't have your own site?
Lack the technical knowledge to mine?
Is electricity cost too high in your area?
Hosting can help you solve these problems.
Equipped with technicians for maintenance and repair
Safe & Reliable Facilities
Increase Your ROI
Speed Up Payback Period
Benefit from Low Electricity Prices

